Wednesday, 28 October 2009

Update- First Draft Finished

We have finished are first draft of the video ahead of schedule and we were able to get feedback from other pupils. From the feedback we found two faults, we needed more range of shots like close ups in the band performance of the instruments. We also found that are band performance could do with some livening up with lights, smoke etc. In the feedback the good points that came out included lip-syncing and the story are video portrays.

Monday, 26 October 2009

Finished Filming

We have know finished our filming now, we stuck to the storyboard for all shots however while shooting we often came up with more shots so we would have as wide a range as possible of shots to make editing easier.

Wednesday, 7 October 2009

Health and Safety

We had to ensure that all are locations for filming were safe of hazards. For example when filming in the graveyard we must ensure that were are character runs is clear of all obstacles. Other than the graveyard are other location are not hazardous.

Tuesday, 6 October 2009